Movement for the Period
- Select a vehicle
- Select a period of time for report generation
- Press button “Add report” and select “Diagram: Movement for the Period”
In the program window the report on the VH movement by day will display:
The following color-coding is used in the report:
- Green - the total time that the vehicle was in movement for the day
- Yellow - the total time of idle vehicle operation for the day
- Red - the total vehicle downtime for the day, i.e. the time that the vehicle spent with the engine turned off
Select the information to display in the legend: